Skip to content
Lemurian
Studios
Call Request a Quote
Menu

Journal · Field note · Nov 12, 2026

How long does it take to build a website?

How long a small business website takes from first call to launch, what each stage involves, and the three things that cause most delays.

For a typical small business site, plan on one to three months from the first call to launch. A handful of pages with the content ready can go faster; a large site with booking, payments or a store takes longer. The range is wide because the design is rarely what sets the pace.

iWhere the time goes

Planning comes first: a call about the business, then a written scope listing the pages and features. Design follows, starting with the homepage and one or two inner pages, then the rest once the direction is agreed. Each round of feedback adds days, so two focused rounds beat five scattered ones.

Then the site is built, the real text and photos go in, and it gets tested on phones, tablets and the browsers your customers use. Launch itself is quick: pointing the domain, setting redirects from old addresses and submitting the sitemap to Google.

iiWhat causes delays

Content, nearly every time. A design can’t be finished around text that doesn’t exist, and writing about your own business is harder than it sounds. Decide early who writes it, you or the designer, and put a date on it.

The second cause is approvals. If three partners all need to agree, feedback takes three times as long unless one of them is given the final say. The third is scope that grows mid-project. Adding a store or a second language halfway through isn’t a tweak; it’s a new project inside the old one.

iiiHow to make it faster

Gather logins, photos and your logo files before the first call. Name one person who approves things. Give feedback in one batch per round, in writing. And launch with the pages that matter, then add the rest; a good site that’s live beats a perfect one still in drafts.

ivWhat about a redesign?

About the same, sometimes a little longer, because the old site’s addresses have to be mapped to the new ones so you keep your search rankings. We cover that in how to redesign a website without losing your Google rankings.

vHow we work

We start with a short call, send a written plan with a fixed quote, and include two rounds of changes. The timeline goes in that plan, so you know the launch date before work begins.

Related: Web design · Website redesign · Contact us to discuss your project today

Journal

More field notes

Full frame

Start here

Your business, full frame

A short call, a written plan and a fixed quote before any work starts. Or begin with the free audit and see what we’d change first.